The Principles as a basis for sustainable filmmaking
The Principles of Sustainable Filmmaking were created by experts and organisations from across the Czech audiovisual industry as a voluntary, practical framework for reducing the environmental impact of filmmaking and strengthening the competitiveness of the Czech audiovisual industry.
When a point objectively cannot be met
It is enough to justify the unavailability of a service or technology in the Final Report; the point is then considered met.
Reviewed and regularly updated
Independent expert evaluation and updates reflect both global developments and Czech conditions.
Show the full text of all 13 Key Points + 9 Recommended points +
1. Sustainability knowledge
1.1Training the production teamKey Point 1+
At a minimum, the producer or production manager of the project will complete an online training course on a European recognised platform such as Albert (in English) of at least one hour. An alternative in Czech is to watch the lecture “Greenfilming in practice – introductory seminar” available on the Greenfilming.cz website. In addition to the video/online training, the producer or production manager will study the Green Filming Manual, which is available on the Greenfilming.cz website. After this training, the producer or the producer’s designated representative should be able to pass on all the information to all the departments so that they can work on sustainability steps continuously from preparation to post-production, collecting the continuous information and passing it on at the end to create a final sustainability report.
1.2Sustainability consultantRecommended+
It is always recommended to hire a sustainability consultant for the project who is trained for this function, has hands-on experience in filmmaking, and can communicate the various sustainability steps with all crew components to be as effective as possible.
2. Energy
2.1Grid connection instead of generatorsKey Point 2+
The production shall investigate the possibilities of grid connection instead of using a generator and use this connection wherever possible. For filmmaking in Prague, this standard applies even if filming on a single location overnight, as long as the connection is sufficient in capacity and less than 100 m from the location. For filmmaking outside of Prague, the network connection must be used for any filming longer than 3 days at a single location within 100 m of the connection point to the location, if available at that location.
2.2Renewable energyRecommended+
It is always recommended to investigate renewable energy options on-site at the filming location, while also inquiring about renewable energy from the on-site energy distributor. Renewable energy should also be preferred in offices and other areas during the preparation of the shoot and also during post-production at suppliers (post-production studios).
2.3LED lightingKey Point 3+
The production will always give preference to low-energy technologies such as LED lighting and similar lighting, as long as it does not interfere with the creative intent and the lighting is technologically affordable.
2.4BatteriesKey Point 4+
Wherever technologically possible, the production shall use rechargeable batteries instead of disposable batteries.
3. Transport and accommodation
3.1Renting EURO 6 vehiclesKey Point 5+
All vehicles rented directly by the production shall have a minimum EURO 6 emission class. This does not apply to transport used by contractors in the context of their other services (construction, lights, props, etc.).
3.2EURO 6 vehicles from suppliersRecommended+
The production should as far as possible demand vehicles with at least EURO 6 emission class also from all its suppliers.
3.3Reducing flightsKey Point 6+
The production shall avoid all domestic and international air traffic if the travel can be covered by train, by a journey no longer than 5 hours. The following order of preference should always be given to the choice of transport: public transport, electric/train – bus – car – plane. Exceptions are last-minute trips due to force majeure or unforeseen events.
3.4AccommodationKey Point 7+
The production will always first check the possibility of using certified green energy accommodation in and around the filming location. If such accommodation is not available, it shall, where possible, give priority to accommodation with a clearly defined sustainable strategy.
4. Materials and waste
4.1Waste managementKey Point 8+
Waste segregation is implemented at each production site during preparation, filming and post-production. Waste is separated according to the site into at least: paper, plastic, mix, metal and glass (a recommended manual for the placement of bins at the filming location is available at www.greenfilming.cz). The production will require contractors to confirm that the sorted waste from the shoot has been delivered to the appropriate waste collection site according to the type of recycling. All electrical equipment, batteries and accumulators from filming will be disposed of in an environmentally friendly manner at designated sites. At the filming location and especially at the catering, the production should always ask for or arrange for the collection of catering waste and subsequent transport to biogas stations. For the catering, the disposal of oil and waste water from the kitchen, as well as the disposal of waste water from washing machines and dishwashers, including the waste water from the costume buses used on location, will be provided in an environmentally friendly manner. Subcontractors, especially special effects (SFX) and construction, will ensure adequate disposal of hazardous waste (paints, thinners, ammunition, explosives, other hazardous substances).
4.2Catering utensilsKey Point 9+
The production will always insist on washable crockery (e.g. ceramic plates) for the main crew at breakfast and lunch venues (where there is a proper lunch break). At the filming location, the production will provide drinking water from the local tap or through water fountains and dispensers so that the crew can use their own refillable water bottles. If it is necessary to use disposable utensils (e.g. during lunch breaks or for large numbers of extras), disposable plastic utensils will not be used.
4.3Compostable utensilsRecommended+
If a production is able to ensure that compostable utensils are processed afterwards so that they are actually composted, it should always give preference to compostable utensils over other disposable utensil options.
4.4Reducing meat consumption and promoting fair tradeKey Point 10+
A vegetarian catering option will be available every day. On projects where catering is paid for by the production, a meat-free day will be introduced at least once a week (or 20% of shooting days). The production only offers fair trade coffee and tea. In the case of capsule coffee machines, recyclable/compostable capsules are used.
4.5Local and seasonal foodRecommended+
It is always recommended to work with local and seasonal foods as much as possible and to find out which foods are available around the location. Caterers should research local sources before filming and prepare recipes that work with these foods to minimise imported foods and the consumption of red meat in particular.
4.6Paper and digitalisationKey Point 11+
All production documents are primarily distributed digitally and printed only where necessary and only in such a way that the print takes up as few pages as possible (narrow margins, thin font, double-sided printing). Orders, invoices and documents where a digital signature is sufficient are not printed. Printed papers not containing sensitive data are collected for use for printing on the reverse side, sticking receipts, etc.
4.7Recycled paperRecommended+
All paper products (office paper, envelopes, wipes, toilet paper) should ideally contain at least 90% recycled content.
4.8Eco-friendly cleaning productsRecommended+
Cleaning products in the production office and in individual departments should be certified as environmentally friendly, indicating their natural composition and easy degradability in water.
4.9Make-up departmentRecommended+
In the make-up department, reusable products should always be preferred over disposable products, and products in recyclable, compostable or refillable packaging. Unless prevented by technology, environmentally certified, natural or local products are always preferred. Cosmetics tested on animals should be completely eliminated, as should all aerosols.
4.10Detailed disposal planKey Point 12+
During pre-production, a detailed disposal plan for sets, costumes and any materials left over after filming will be prepared for all locations. Emphasis is placed on reusing all materials as much as possible, storing or donating them for further use (including outside the film industry) so that only a minimal amount of material ends up in a landfill at the end of filming.
5. Reporting
5.1Final ReportKey Point 13+
At the end of the shoot, the producer, their designated staff member or sustainability consultant will compile a final report summarising all points met or not met in the form of an affidavit with a justification as to why the points could not be met. The final report template includes a table mapping the points met and a written final report explaining the fulfilment or non-fulfilment of each point.
5.2Detailed sustainability reportRecommended+
It is recommended that a detailed sustainability report is issued after the project end, mapping out the detailed steps including quantified carbon footprint savings, successes and failures achieved, and including detailed photo documentation. This report should then be sent to all those involved in the project.
“Produced in accordance with the Principles of Sustainable Filmmaking in the Czech Republic”
If you meet all 13 Key Points, you may use this phrase in the closing credits of the work. Compliance is demonstrated by a Final Report containing an affidavit.
Good news: if a Key Point cannot be met because a service or technology is unavailable, and you state and justify this in the Final Report, the point is considered met.
Getting started is simple – already in pre-production
In four steps, we show you what to focus on and where to find support. Many of the Principles fit naturally into everyday production processes, especially when they are considered from the planning stage.
Pre-production
To begin with, it is enough to appoint a producer or production manager who will get to know the Principles and help build them into the project plan. Even a short training makes it easier to decide in good time about grid connection, transport or handling materials.
Support to get started: You can take the one-hour online seminar BAFTA albert in English, watch a recorded training in Czech, or join lifelong learning courses at FAMU.
Filming
There is no need to introduce a complicated new system during filming. It helps to appoint one person to collect the available records as you go – for example electricity meter readings, fuel and purchase receipts, meal counts or waste collection confirmations. The final evaluation will then be much easier.
You don’t have to search alone: The Guides section (in Czech) offers a map of grid connection points, a procedure for temporary grid connection and recommendations for placing waste bins.
Post-production
At this stage the production’s options are narrower – and there is no need to solve everything. The simplest step is to ask a studio or supplier, when choosing them, where their energy comes from and how they reduce the impact of their operations. Even asking helps support the services that are preparing for change.
What is in your hands: Choosing a partner and asking a few simple questions about the studio’s energy, technology and operations.
Final Report
The Final Report summarises what has been achieved and where obstacles remain. Your broadcaster or co-production partner will provide you with the Unified Reporting on the Principles of Sustainable Filmmaking; independent productions submit the same data via APA.
If a point could not be met because a service or technology was unavailable, it is enough to describe the reason clearly. Every such explanation also helps show what still needs to be developed in the Czech context.
Why we fill in the report: So that we can share experience, compare results and create better conditions for future productions.
Need advice? Would you like us to give a talk or training for you?
Get in touch — we are happy to advise, no membership required. From a specific shoot to a talk for your team, crew or school.